SOLUTION
What was the solution?
The new pump solution was developed through collaboration with Allweiler. Frank Kahnert (Area Sales Manager) and Sascha Illhardt (Technical Sales) from Allweiler visited the wastewater treatment plant to assess the situation firsthand and worked with Dominik Potdevin, KLEM’s plant engineer, to develop a customized proposal.
From the very beginning, the customer was integrated into the entire process: After the decision to use Allweiler pumps had been made, Mr. Potdevin visited the Allweiler plant in Bottrop to observe the assembly of the pumps, which were manufactured specifically for the wastewater treatment plant.
In April 2024, four Allweiler AEB2E1450-IE/014G0K YLW 113A P eccentric screw pumps were finally installed at the Emschermündung wastewater treatment plant.
These pumps are specifically designed for use in waste-water treatment plants and, thanks to their design – in-cluding the correct speed, series, and a highly wear-resistant version of the Alldur® stator with a ductile, hard-chromed rotor – offer a longer service life. As a result, wear was reduced and the service life of the pumps was more than doubled.