Self-sufficient system
The plant went into service in 2001 solely to provide preliminary clarification. In 2001, a biological clarification stage was added; the biology was expanded in 2005; and in 2011 the plant was expanded at every level. It is currently designed for up to 1,400,000 resident equivalent units and a capacity of 210,000 m³ per day (38,529 gpm). Antalya processes all wastewater according to the German standard ATW131. Daily production of 6,500 m³ (8,502 cubic yards) of digestion gas covers all of the plant's energy requirements. This gas, produced during sludge treatment, contains approximately 65 % methane and 35 % CO . On average, 150 metric tons of 2 digested sludge are produced every day. The final product is composed of 90 % dry matter. Nearly 140 kg (309 lb) of this material are produced every hour.